HomeServicesResidential ElectricalCommercial ElectricalIndustrial ElectricalEV Charger InstallationPanel Upgrades Panel Capacity Check EV Charger Check Service AreasOur WorkReviewsAboutContact
Get a Free Quote Call 949-951-0490

EV chargers

EV charger installation, done to code the first time

Level 2 and Tesla Wall Connector installations across Orange County, load calculated, permitted, inspected, and wired to handle a car you haven't bought yet. We've been doing electrical service work here since 1981, so we know which cities move fast on permits and which don't.

4.9 out of 5
Google reviews
Licensed C-10
CSLB #732908
A+ Rated
Better Business Bureau
24/7
Emergency service

What we do

  • Level 2 (240V) charger installation, any brand
  • Tesla Wall Connector installation
  • NEMA 14-50 and 6-50 outlet installation
  • Dedicated circuits sized to NEC 625.42
  • Load calculation and panel assessment included
  • Load-management devices as an alternative to a full upgrade
  • Panel upgrades where the service can't carry the charger
  • Multi-unit and commercial charging, see our commercial page
Level 2 EV charger installed in an Orange County garage by Gerhard Electric
Warning signs

When it's worth calling someone

If you're seeing any of these, it's not a wait-and-see situation.

  • Your charger keeps tripping the breaker
  • The plug or outlet gets hot while charging
  • You're on a 120V outlet and it takes three days to charge
  • A previous install was never permitted or inspected
  • You're adding a second EV and don't know if the panel can take it
Diagram of an electrical panel showing four warning signs: scorching on a breaker, rust and water staining, no spare breaker spaces, and a double-tapped breaker
The process

How the job runs

1

Free assessment

We look at your panel, run the load calculation, and work out the cleanest conduit route from the panel to where you park.

2

Written price

Fixed price including the permit. If the calculation says you need a service upgrade, we tell you before you spend money, not after.

3

Permit and install

Permit pulled with your city. Most single-charger installs are done in a day.

4

Inspection and handover

City inspection, then we test it with your car and show you how the charger reports faults.

Cost

What actually moves the price on an EV charger install

Two identical chargers on two identical cars can be very different jobs, and almost all of the difference is in the six things below. None of it is mysterious once someone explains it.

How far the charger is from the panel

This is the single biggest variable. A charger on the garage wall a few feet from the panel is a completely different job from one on the far side of the house.

Whether the panel has room, and whether it has capacity

Those are two separate questions. Empty breaker spaces do not mean spare amps. The EV Charger Check on this site answers the second one before anybody comes out.

The circuit your car can actually use

There is no point paying for a 60A circuit if your car's onboard charger tops out below it. We size the circuit to the car and the charger together, not to the biggest number available.

How the cable gets from A to B

Surface conduit along a garage wall is straightforward. Fishing a finished wall, going under a slab, crossing a driveway or reaching a detached garage is not.

Whether load management beats a panel upgrade

Sometimes a load-management device lets an existing panel carry the charger and saves you the service upgrade entirely. Sometimes it does not. It is worth checking before assuming you need a new panel.

The permit and the inspection

Required, and California law limits how long a city may take over it. We pull the permit and meet the inspector so you are not chasing anybody.

The assessment and the quote are free. If you want to know where you stand before booking anything, the EV Charger Check works out the circuit your car and charger actually need.

Reviews

4.9 stars, and most of them mention the same things

Clean work, real communication, and showing up when we said we would. These are verified Google reviews, pulled live.

★★★★★
Mark and his team are the best! They will coordinate with the city, pull permits, set up inspections with city inspector, great communication with tenants and Mark's clients!
Mark D.Google review
★★★★★
We have used Gerhardt Electric many times over the years. Every one of the electricians are so knowledgeable and nice. They are polite, and tidy. Would be reluctant to hire anyone else to our electrical needs
Maryshannon L.Google review
★★★★★
We had an emergency of our upper story electrical circuit stop working and sparking happening just before. An electrician arrived less than 2 hours later. Fixed the problem.. we have been pleased with the work Gerhard Electric has done
Patricia B.Google review
FAQ

Common questions

Can my panel handle an EV charger?
That's exactly what our free Panel Capacity Check estimates. A 40A charger is a 9,600 VA continuous load, which is significant on a 100A service that's already running an electric dryer and A/C. We do the real calculation on site, free.
What does EV charger installation cost?
It depends on the distance from the panel, whether the run is through finished walls, and whether your service has capacity. We give you a firm written price after a free on-site assessment.
Is there a rebate?
Southern California Edison's Charge Ready Home program offers rebates covering the panel upgrade and the 240V circuit, up to $4,200 for income-qualified households and up to $2,100 in designated disadvantaged communities, and it requires a licensed electrical contractor. Amounts and funding change, so we confirm current eligibility with you before quoting.
What about the federal tax credit?
The federal 30C credit for home charging equipment has ended for most Orange County addresses. It applied only to property placed in service through 30 June 2026, and even then only in qualifying low-income or non-urban census tracts. We won't quote you a number based on it.
Do I need a permit for an EV charger?
Yes. California law requires cities to use a streamlined, checklist-based review for EV charger permits, with same-day or five-business-day turnaround for compliant applications. We handle it.
Can I avoid a panel upgrade?
Sometimes. A load-management device lets the charger share capacity with another large load, pausing charging while the dryer runs, for example. Whether it's accepted depends on your equipment and your inspector, but it's often materially cheaper than a service upgrade and we'll always price both.

Ready when you are

Free estimates on panel upgrades, EV chargers and major electrical work. Same-day emergency service across Orange County.

24/7 Emergency Free Quote