EV chargers
EV charger installation, done to code the first time
Level 2 and Tesla Wall Connector installations across Orange County, load calculated, permitted, inspected, and wired to handle a car you haven't bought yet. We've been doing electrical service work here since 1981, so we know which cities move fast on permits and which don't.
What we do
- Level 2 (240V) charger installation, any brand
- Tesla Wall Connector installation
- NEMA 14-50 and 6-50 outlet installation
- Dedicated circuits sized to NEC 625.42
- Load calculation and panel assessment included
- Load-management devices as an alternative to a full upgrade
- Panel upgrades where the service can't carry the charger
- Multi-unit and commercial charging, see our commercial page
When it's worth calling someone
If you're seeing any of these, it's not a wait-and-see situation.
- Your charger keeps tripping the breaker
- The plug or outlet gets hot while charging
- You're on a 120V outlet and it takes three days to charge
- A previous install was never permitted or inspected
- You're adding a second EV and don't know if the panel can take it
How the job runs
Free assessment
We look at your panel, run the load calculation, and work out the cleanest conduit route from the panel to where you park.
Written price
Fixed price including the permit. If the calculation says you need a service upgrade, we tell you before you spend money, not after.
Permit and install
Permit pulled with your city. Most single-charger installs are done in a day.
Inspection and handover
City inspection, then we test it with your car and show you how the charger reports faults.
What actually moves the price on an EV charger install
Two identical chargers on two identical cars can be very different jobs, and almost all of the difference is in the six things below. None of it is mysterious once someone explains it.
How far the charger is from the panel
This is the single biggest variable. A charger on the garage wall a few feet from the panel is a completely different job from one on the far side of the house.
Whether the panel has room, and whether it has capacity
Those are two separate questions. Empty breaker spaces do not mean spare amps. The EV Charger Check on this site answers the second one before anybody comes out.
The circuit your car can actually use
There is no point paying for a 60A circuit if your car's onboard charger tops out below it. We size the circuit to the car and the charger together, not to the biggest number available.
How the cable gets from A to B
Surface conduit along a garage wall is straightforward. Fishing a finished wall, going under a slab, crossing a driveway or reaching a detached garage is not.
Whether load management beats a panel upgrade
Sometimes a load-management device lets an existing panel carry the charger and saves you the service upgrade entirely. Sometimes it does not. It is worth checking before assuming you need a new panel.
The permit and the inspection
Required, and California law limits how long a city may take over it. We pull the permit and meet the inspector so you are not chasing anybody.
The assessment and the quote are free. If you want to know where you stand before booking anything, the EV Charger Check works out the circuit your car and charger actually need.
4.9 stars, and most of them mention the same things
Clean work, real communication, and showing up when we said we would. These are verified Google reviews, pulled live.
Mark and his team are the best! They will coordinate with the city, pull permits, set up inspections with city inspector, great communication with tenants and Mark's clients!
We have used Gerhardt Electric many times over the years. Every one of the electricians are so knowledgeable and nice. They are polite, and tidy. Would be reluctant to hire anyone else to our electrical needs
We had an emergency of our upper story electrical circuit stop working and sparking happening just before. An electrician arrived less than 2 hours later. Fixed the problem.. we have been pleased with the work Gerhard Electric has done
Common questions
Can my panel handle an EV charger?
What does EV charger installation cost?
Is there a rebate?
What about the federal tax credit?
Do I need a permit for an EV charger?
Can I avoid a panel upgrade?
Ready when you are
Free estimates on panel upgrades, EV chargers and major electrical work. Same-day emergency service across Orange County.
