HomeServicesResidential ElectricalCommercial ElectricalIndustrial ElectricalEV Charger InstallationPanel Upgrades Panel Capacity Check EV Charger Check Service AreasOur WorkReviewsAboutContact
Get a Free Quote Call 949-951-0490

Free tool · about two minutes

Can your panel handle what you're about to plug into it?

An EV charger, a heat pump, an induction range and a hot tub are each fine on their own. Together they're a different conversation. Answer a few questions and see roughly how much of your electrical service is already spoken for.

Panel Capacity Check

A simplified NEC 220.82 load calculation. Free, instant, and we don't ask for your email.

2,000 sq ft
Estimated share of your electrical service in use
0%
of your service in use
Estimated demand
0 A
Your service
200 A
Headroom left
0 A
Calculated load
0 kVA
 

 

Get a free quote

This is an estimate, not a quote or a permit document. It applies the optional calculation method in NEC 220.82 using typical appliance nameplate values, and does not account for your actual equipment ratings, existing breaker spaces, conductor sizing, service conductors or your city's requirements. A permit-ready load calculation requires an on-site evaluation by a licensed electrician. Gerhard Electric, CSLB #732908.

How to read it

What the number actually means

Under 70%

You've got real headroom. Adding a circuit is usually straightforward. The question becomes whether your panel has physical breaker spaces free.

70-90%

Workable, but tight. Worth pricing an upgrade before you add anything else, or looking at a load-management device that lets equipment share capacity.

Over 90%

You're at or past what the service is rated for. A 200A upgrade or load management is almost certainly needed, and an inspector will say the same.

Why we built this

Most people find out the expensive way

Homeowners usually discover their panel is maxed out after they've bought the car, or after the hot tub is sitting on the patio. By then the electrical work is an emergency purchase rather than a planned one.

This tool won't replace a real load calculation, nothing on a website can. What it will do is tell you, in about two minutes, whether you're in comfortable territory or whether you should get someone out before you spend money on the appliance.

If it says you're fine, that's a genuinely useful answer and we're happy for you to close the tab.

A service panel replaced by Gerhard Electric in Orange County
FAQ

Common questions

Is this a real load calculation?
No. It applies the optional method in NEC 220.82 with typical nameplate values to give you a ballpark. A real calculation uses your actual equipment ratings, your existing conductors and your city's amendments, and has to be done on site by a licensed electrician. We do those free as part of a panel upgrade estimate.
Where do I find my panel size?
Look at the largest breaker at the top or side of your panel, usually a double-width switch marked 100, 125, 150 or 200. If there's no main breaker inside, it may be at the meter outside. If you can't find it, send us a photo and we'll tell you.
My panel says 100A but everything works fine. Do I need to upgrade?
Not necessarily. Plenty of 100A services run a house comfortably. The question is what happens when you add a large continuous load like an EV charger. That's exactly what this tool is estimating.
What is load management?
A device that lets two big loads share one circuit's capacity, for example, pausing your EV charger while the dryer runs. In some cases it's a legitimate alternative to a full service upgrade, and it's usually cheaper. Whether it's allowed depends on your equipment and your inspector.
Do you charge for the estimate?
No. Estimates for panel upgrades, service changes and EV charger installations are free, and include the on-site load calculation.

Want the real number?

We'll come out, run a proper load calculation, check your breaker spaces and conductors, and give you a written price. Free, and no obligation.

24/7 Emergency Free Quote